Anchored Wall Example: Soldier Pile Wall with Tiebacks (SI Units)

Anchored Wall Example: 12m Excavation - Soldier Pile Wall with Tiebacks


In this example we will design an anchored soldier pile and lagging wall, with three tieback rows, supporting a 12m excavation. The model and analysis have been designed with DeepEX - Shoring Design Software.


A. Project Description


In this example we will design an anchored soldier pile and lagging wall with 3 tieback rows, supporting a 12m excavation. The Figure below presents the project model. Tables 1 and 2 present the soil properties and the stratigraphy respectively. Table 3 presents the external loads. Tables 4 and 5 present the wall and support properties respectively. The general ground surface is at El. 0m and the general water table is at El. -15m.


xsoldier_piles_tiebacks_excavation_deepex_siunits_model_2.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.rt7Zw6mUrX.jpeg

Figure: Project model.


Table 1: Soil properties.


Soil properties

Table 2: Stratigraphy.

Soil Layer

Elevation (m)

OCR

Ko

F

-0

1

0.577

C

-2

1

0.515

S1

-8

1

0.47

S2

-13

1

0.441


Table 3: External loads.

Load

Load Type

Start Point

End Point

Load Magnitude

Load 1

Strip Surcharge

(-15.5,0)

(-0.5,0)

25 kPa


Table 4: Wall parameters.

Soldier pile width

0.4 m

Soldier pile section

IPE 400

Soldier pile spacing

2 m

Lagging

2 in Timber

Wall length

18 m

 

Table 5: Support parameters.

 

Tieback 1

Tieback 2

Tieback 3

Tieback elevation on wall

-3 m

-6 m

-9 m

Tieback spacing

2 m

2 m

2 m

Angle

20 deg

20 deg

20 deg

Free length

5 m

5 m

5 m

Fixed length

11 m

11 m

11 m

Support section

4 Strands x 0.525in

4 Strands x 0.525in

4 Strands x 0.525in

Prestress

310 KN

310 KN

310 KN



DeepEX Features

DeepEX Features


All software features and capabilities! Review all available design methods and analysis standards!



 

DeepEX Upgrades

DeepEX Upgrades


We continue our research and we introduce new unique features that extend the software capabilities!



 

HoloDeepEX

HoloDeepEX


Export and visualize 3D deep excavation models in Virtual and Augmented Reality! Impress your clients!



 

B. Modeling with DeepEX


The model will be created using the DeepEX Model Wizard:


  • Define Analysis Methods:


xwizardgeneral_all_1.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.c13k_HS06R.webp

Figure: Analysis Methods in DeepEX Wizard.


In this dialog, we choose to apply Limit Equilibrium Analysis method to our model. For the classical earth pressures in design stages with multiple support levels we define FHWA apparent pressures and for the beam analysis we choose CALTRANS method.


  • Define project type and dimensions


xsoldier_piles_tiebacks_excavation_deepex_siunits_1.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.tsPc1DCKr2.webp

 

Figure: Project Type and Dimensions in DeepEX Wizard.


In this dialog we select the project type (in this case we select the option to create an anchored wall model). Next, we define the project dimensions (final excavation depth, walls depth, excavation width, top of the wall elevation and water table). Finally, we define the support properties (in this case tieback spacing and the tieback structural section). The software will use the same properties (spacing, structural sections etc) for all created supports. Later we can access each support on the model area (double-click on the support) and edit the specific support properties.


  • Define soil types and stratigraphy


xwizardgeneral_all_2.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.YvX0Rxke6o (1).webp

Figure: Soil Properties and Soil Layers in DeepEX Wizard.


xwizardgeneral_englishunits_2_3.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.pza1gAf8K0.webp

Figure: Soil Properties and Soil Layers dialogs in DeepEX.


In these dialogs we can define the required soil types and the properties for each created soil, as well as, the model stratigraphy by defining the top of the soil layer elevation and the soil type in each layer.


  • Define wall type and wall section properties


xsoldier_piles_tiebacks_excavation_deepex_siunits_wizard_2_1.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.Fxf90FcB0t.jpeg

Figure: Wall types in DeepEX Wizard.


xsoldier_piles_tiebacks_excavation_deepex_siunits_wizard_2_2.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.6znJuQ_Dc6.jpeg

Figure: Wall Sections dialog in DeepEX.


In these dialogs we select the wall section type (in this case soldier pile and lagging wall), the soldier pile section, the wall spacing and the concrete – steel materials. Here, we also define the lagging material, thickness and position.


  • Define Stages – Support Elevations


xsoldier_piles_tiebacks_excavation_deepex_siunits_wizard_3.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.98Baw4oULZ.webp

Figure: Support Elevations in DeepEX Wizard.


In this dialog, we define the depth from the surface or each support level, as well as, the depth below each support level where we wish to excavate in the stages, before the support is installed. The software automatically calculates all elevations (excavations and support installation levels) of these defined depths and generates all intermediate construction stages.


  • Define Surcharge


xwizardgeneral_siunits_3.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.VUET5q4mIj.webp

Figure: Support Elevations in DeepEX Wizard.


In this dialog we define the surcharge type and properties, as well as the surcharge modeling options. In this case we will use a 25KN strip surcharge, developed for 15m, starting 0.5m behind the left wall. After the model is automatically generated by the software wizard, we can access the stages in the model area and add any required additional loads graphically, using the Draw Loads options in the General tab of DeepEX.


  • Define structural codes:


xwizardgeneral_siunits_4.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.DlxMTOXl5l.webp

Figure: Structural Codes in DeepEX Wizard.


In this dialog, we can define the structural and geotechnical design codes that we wish to assign to this model. In this case, we will use Eurocode 2 and Eurocode 3 specifications for concrete and steel design.


The software automatically creates all project construction stages, according to our selections in the Model Wizard. The following Figures present the models in Stages 5 and 7 respectively:


xsoldier_piles_tiebacks_excavation_deepex_siunits_model_1.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.4KTLIuDtJn.jpeg

Figure: Generated Model – Stage 5.


xsoldier_piles_tiebacks_excavation_deepex_siunits_model_2.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.rt7Zw6mUrX.jpeg

Figure: Generated Model – Stage 7.


 

Additional Modules

Additional Modules


Additional modules are available! Customize your DeepEX version based on your project needs!



 

Training Videos

Training Videos


DeepEX can design and optimize any deep excavation in minutes! Review our professional training videos!



 

Design Methods

Design Methods


Several design methods for the wall beam analysis and various geotechnical standards are implemented!



 

C. Anchored Wall Analysis and Results

 

Since the model is ready, we can choose to calculate the design section, pressing on the button


Selected design


After the analysis is succeeded, the Summary table appears. The table below includes some critical checks and values for each construction stage. The following figures present some graphical results from the results tab of DeepEX.


Table: DeepEX critical results/stage


xsoldier_piles_tiebacks_excavation_deepex_siunits_results_1.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.r4hrMZaKs0.webp

xsoldier_piles_tiebacks_excavation_deepex_siunits_results_2.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.aPu86gVHyh.webp

Figure: Wall moment and shear diagrams, Stage 7.


xsoldier_piles_tiebacks_excavation_deepex_siunits_results_3.jpg__800x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.vxyIW3Mqie.jpeg

Figure: Wall deflections and soil pressures diagrams, Stage 7.


xsoldier_piles_tiebacks_excavation_deepex_siunits_results_4.jpg__500x0_q85_subsampling-2_upscale.jpg.pagespeed.ic.FwR4XpS4Wn.jpeg

Figure: Wall embedment safety factors, Stage 7.


 

Presentations DeepEX.png

Wish to Design an Anchored Wall?


Book a FREE online presentation now!




 

DeepEX - Shoring Design Software

DeepEX - Shoring Design Software


DeepEX is the ultimate software program for design and analysis of Deep Excavations! Design any wall type and support system in the most efficient way!

  • Structural and Geotechnical Design

  • Modern Interactive Interface

  • Model Automatic Optimization

  • Export Reports and Sketches

  • Limit Equilibrium - Non-Linear - Finite Element Analysis

  • 2D Design Sections  - 3D Frame Analysis



 

Projects designed with DeepEX

$2 Billion Hudson Yards, New York

Circular wet soil mix shaft, Florida

Soldier Pile Wall in Manhattan, NY

HudsonYards_Excavation.jpg
Circular_Shaft_Hillsborough river microtunnel-Florida.png
SoldierPileWall_Manhattan.jpg


 

DeepEx

DeepEx Demo


Structural and Geotechnical design of Deep Excavations.


Try the Full version for free and see how you can design and optimize any deep excavation model in the most efficient way!


Starting at

$ 3750



 

Web Presentation

Web Presentation


Get a Free online presentation! Learn about all software features and capabilities!



 

Purchase DeepEX

Purchase DeepEX


Get the most powerful shoring design software! Customize your version!



 

Software

Software


Review our software programs for geotechnical engineers and contractors!



 

Trusted by


Trusted by partners

 